Main features of our wind turbine,
Pitch Control, Blades Design, Aerodynamics and Monitoring.
Transport and assembly in the tower of celosia in the field of CIEMAT, connections and start-up for its certification.
Assembly and testing of all parts with inverters and corresponding software.
Assembly of each 40kW part, rotor with variable pitch, PMG, nacelle with hydraulic power unit, blade and blade attachment.
One time is all connected and revised in the factory the last part is the installation y the test land where will start the process and controls to verify that all is running well.
The mechanical parts and components are other of the most important pieces. Put the screws, supervise the weldings, mount all correctly and connect all the control systems are one of the most important points.
Each part of the aerodynamic components of turbine has a similar procedure, but changing the main materials
The process is complicated, because one time we have the main material after that, is necessary to start a special treatment with paint and resins.
One of the main concepts to develop a wind turbine is the aerodynamic structures and how to manufacture that, in this pictures you can see the base to start the manufacture process.